Theoretical cpu*hrs
We have 295,867 sus available for our account. Jobs submitted to normal queue. First batch on 512 cpus for 15 hours. Took a sampling of the four times by using ls -ltr
(beginning, the middle, two at the end) between the selected chombos.
We have 1,440 minutes in a day. So we can calculate out the average rate:
For both of these runs we want to have 200 frames. Taking the difference from what we can see from the first rows of our jobs listed below, that means we have 177 frames left for the hydro case, and 182 for the mhd case. Using our average rates from above, that means it will take approximately 3 days to finish the hydro run, and 5 days to finish the mhd run (based on these values). There are 72 hours in 3 days and 120 hours in 5 days. One can see I'll be under the SU limit for the following cpu*hrs.
512 cores
For the hydro case:
For the hydro case:
Total:
Stampede Run Statistics
Hydro/MHD | Path | Date Row Editted | Frames Completed/Total | Filling Fracs | Walltime Taken/Left, (0 days == Ready for Restart) | (1-2) Info, (3) Message allocations | Framerate (hrs/frame), No. cores | Notes |
Hydro | /scratch/03517/tg828161/ProductionRuns_WireTurbulence/hydro | 05-11-2015 | 23/200 | 0.038 0.622 | 3.5 days/0 days | 34.6 gb, 164.9 mb, 56.9 mb | ~0.5hrs/frame, 512 cores | Chombos started May 7th at ~15:46. |
/scratch/03517/tg828161/ProductionRuns_WireTurbulence/hydro/Restart | 05-11-2015 | 23/200 | TBA | TBA | TBA | , 1024 cores | Using previous run, going to do a study on number of cpus needed for sus left. | |
MHD | /scratch/03517/tg828161/ProductionRuns_WireTurbulence/mhd | 05-11-2015 | 18/200 | 0.091 0.865 | 20.4 days/0 days | 225.3 gb, 585.0 mb, 240.9 mb | ~0.75hrs/frame, 512 cores | Chombos started May 8th at ~9:45. |
/scratch/03517/tg828161/ProductionRuns_WireTurbulence/mhd/Restart | 05-11-2015 | 18/200 | TBA | TBA | TBA | , 1024 cores | Using previous run, going to do a study on number of cpus needed for sus left. |