Meeting Update 0908

I finished four NLUF runs:

  1. hydro
  2. beta = 1 with Spitzer resistivity (temperature cut-off at 3000k)
  3. beta = 10 with Spitzer resistivity (temperature cut-off at 3000k)
  4. beta = 1 with Spitzer resistivity (temperature cut-off at 1000k)

The animations should all be up tonight.

The final TSF run is currently at frame 83 of 200. I'm constantly getting restarted because of high CFL number. This run should finish this week.

Comments

No comments.