Update 03/28/16 - Eddie

  • 3-D pulsed jets are still running, only hydro run is finished. Beta = 1 run will be done in about a week on bluehive, beta = 5 is 75% done and beta = 0.4 is only 50% done on davinci. The queues on davinci take way too long, so I'm going to move the beta = 0.4 run to bluehive as well. It'll take a while since I can only get 120 cores, but at least it'll be making progress.

hydro emission movie

  • Ready to finish response to referee report on clumpy paper. Need to have meeting with Pat.
  • Finished first draft of cooling paper, ready to revise and add figures. Working on some cooling curve plots now.

Attachments (1)

Comments

No comments.