Update 11/26

Parameter Space Paper

Submitted. Need to get password for one of macs to get data for movies to upload to YouTube. Also need to make list of people to send to.

Radiation Pressure

7 additional frames finished. VisIt is having problems drawing the Mach contour the first time (works on redraw) — any thoughts?

http://www.pas.rochester.edu/~adebrech/HD209458b/high_flux_307.png

There may be a slight bulge starting at the planet again, but it's still too early to say definitively.

AMR line transfer

Jonathan and I had a productive meeting two Wednesdays ago. I should be able to sit down and get a functional version this week.

Project Statuses

  • Radiation Pressure
    • Outline of paper
    • Need to make a few more plots for high Lyman flux case, once it's completed (early December?)
    • Will address Eric's email, as well - measure speeds of blowoff at a variety of points along side and compare to energy requirements
  • AMR line transfer
    • Sketch of code written, significant modifications required
  • Charge exchange
    • Next will be stellar wind, no ionizing flux, to see effects of just mixing
  • HD209458b
    • High ionizing flux - effect on mass loss rate/wind structure

Comments

No comments.